Working Safety in Construction Project Part 3

Identification 
  • Each project have different characteristic, e.g. high-rise building project, weir development, plant wide etc.. 
  • Do identify danger potency in construction activity that will be performed. 
  • For mapping danger potency terminological area or activity area each.
Evaluation 
  • Arrange evaluation about danger potency to determine priority scale bases Hazards Rating. 
  • Risk Rating's grade of all construction activity that will be done.
Develops The Plan 
  • Base Identification result and strategical grade Evaluation operation and accident prevention. 
  • Apply default working safety management concept. 
  • Grade Programs K3LL'S Implementation and program that will be done (for deep shaped activity element) 
Element example Programs Implementation 
  • K3's policy 
  • Administrative and Procedural 
  • Lurching identification 
  • Project Safety Review 
  • Construction and Training 
  • Safety Meeting and Safety Committee 
  • Safety Promotion 
  • Safe Working Practices 
  • Work Permit system 
  • Safety Inspection 
  • Equipment Inspection 
  • Contractor safety 
  • Then lintasJalan 
  • Environmental management 
  • Waste management and B3 
  • Prevention and Tacling burnup 
  • Emergency 
  • Accident and Reporting investigation 
  • K3's audit 
Policy 
  • Constituting K3's success base in project. 
  • Loading komitment and management support culminates to K3's performing in project. 
  • Shall be publicized to all employ and is utilized as base of another project policy. 
Administrative and Procedural 
  • Establishing managements organisational system K3 in project. 
  • Establishing personal and officer that handles K3 in project. 
  • Establishing procedure and sistim is K3's job up to project happens to comprise task and authority all element relates
Lurching identification 

Lurching identification shall be done on each project step that covers: 
  • Design Phase 
  • Procurement 
  • Construction 
  • CommisioningdanStart up 
  • Hand over to owner 
Project Safety Review 
  • Accord project developing done by K3's study that ranges to K3's mainstay in design and its development performing. 
  • K3's study is performed to make sure that project was built by dengans good safety default according to stipubting. 

Comments

Popular posts from this blog

Pepadone Wong Serang, Kamus Base Jawe Serang

Legenda Desa Gunung Malang

Tanah-Tanah Strategis di Kota Serang