Posts

Showing posts from November, 2008

PLAFOND GYPSUM'S ASSEMBLY

Image
FLOW CHART

ASSEMBLIES TECHNICAL FOR MULTIROOF

Image

TECHNICAL INSTALLATION FOR METAL DECK

Image
ASSEMBLY TECH  Blustery tenor looking at, assembly aim at variance with wind aim.  Utilize bottom to step on zinc upon stacked gording.  Utilize bolt / right for brace already at galvanic.  Utilize gimlet to protect roof and clears filth each assembly finish.  BRACING ASSEMBLY / BOLT    BIAS TRICK  Labour to keep metal's roof bank in a state dry and indirect in reference to earth, water pond or other filth.  If is kept at exposed place, shall pile oblique ala to avoid water pond at valley thatches metal wave and continually been closed by canvas or plastic. 

PERFORMING METHOD TALK SHOP CERAMICAL FLOOR part 2

Image
DELFT AERATED BY PLACED ON CERAMICAL PLACE,   AFTER PROCESSES SOAKING.  CERAMICAL PLACE  COUPLE BASELINE DETERMINATIVE AND PEIL OF FLOOR.  THIS PEIL'S DETERMINATION FOR ALL UNITY.   YARN TIDE AIMS HORIZONTAL AND VERTICAL ON ELEVATIONS APPROPRIATE FLOOR ON SHOP DRAWING.  DOMICILE YARN SHALL LEVEL OFF AND ELBOW, IF AUGHT WALL IS WALL DELFT,  THEREFORE POSITION NAD FLOOR SHALL ADJUSTED BY AUGHT ON WALL.  CERAMICAL TIDE AS COUPLE OF BASIS, ALONG BASELINE ALREADY BEING ASSEMBLED.  CROSS A CHEQUE CERAMICAL ELBOW WITH ANGLE BAR AND CERAMICAL ELEVATION FLATNESS WITH WATERPASS.  SECTIONED CONTENT / FLOOR SURFACE REGION THAT ANOTHER BY TELLS ON / SPESI.  TIDE AFTERWARDS NEXT DELFT ACCORDS ITS POSITION UNTIL FINISHED,  LABOUR SO NO THREAD.  IF DELFT WAS ASSEMBLED ALL,  KNOCK CERAMICAL SURFACE WITH RUBBER MALLET FOR FLATTEN DELFT SURFACE SO DOES NOT WRECK / BLEMISH.  CHEQUE AFTERWARDS CERAMICAL ELEVATION FLATNESS WITH WATERPASS.  CLEAR CERAMICAL COUPLE SURFACE ALREADY BEEN ASSEMBLED BY CLOTH /

PERFORMING METHOD TALK SHOP CERAMICAL FLOOR

Image
A.   PLANNING   I.   SHOP DRAWING:   DETERMINING CERAMICAL CUT REST HAS > ½ CERAMICAL BODY.  DETERMINING CERAMICAL NAD WALL & THAT FLOOR MEETS & NAD UNIFORM DELFT.  DETERMINE SO DELFT CROSSROAD MEETS.  DETERMINING SANITAIR'S LAYOUT & FIXTURE :    SHALL AT CROSSROAD / CERAMICAL BODY MEAN.  DETERMINING CERAMICAL ASSEMBLY STARTING POINT.  DETERMINING MINIMAL EXPANTION JOINT EACH   12 M² 16 M².  II.  RESOURCES'S COUNT( RESOURCE) :   a.   MATERIAL THAT IS UTILIZED:   DELFT.  PC CEMENT.    WATER.  ADDITIVE.     b.   TOOL THAT IS UTILIZED:   ALUMINIUM MARGIN.   WATER TUB(  PAIL).   DUDUKAN / TATAKAN'S PLACE DELFT.   YARN OR STRING.   RUBBER MALLET.   SPESI'S SPOON.   WATERPASS.    SPADE.   SPUME / SPONGE   CLOTH / WET MOP.       c.   LABOUR:  DETERMINING NEEDED LABOUR ON SCHEDULE AND WORK VOLUME. B.   PERFORMING:  MAKE READY EQUIPMENT    AND MATERIALS    ONE THAT WILL BE UTILIZED.  UNDERSTAND JOB IMAGE,  ASSEMBLY PATTERN   AND OTHERS.  SORT OUT THAT DELFT RESULT

PERFORMING METHOD TALKS SHOP DOOR CUSHION ASSEMBLY / ALUMINIUM WINDOW

Image
A.   EQUIPMENT THAT IS UTILIZED:       1.    RUBBER WEDGE / TIMBERED  2.    GIMLET   3.    SCREWDRIVER    B.   MATERIAL THAT IS UTILIZED:       1.    ALUMINIUM CUSHION  2.    DOOR LEAF / WINDOW(  AFTER BEEN ASSEMBLED GLASS)   3.    FISCHER  4.    SCREW  5.    MORTAR / CEMENT / SEALANT  6.    VASELINE / INSULATES PAPER / PLASTIC  C.   PERFORMING:       TIDE    CUSHION    DOOR / ALUMINIUM WINDOW ON PRESCRIBED LOCATION( ACCORD TYPE WHATEVER AVAILABLE), CUSHION HOLE SUITING WITH SIZE CUSHION(  HOLE DIFFERENCE 1 CM).   INSERT CUSHION   ONE THAT READY WAS ASSEMBLED TO GO TO WALL HOLE WITH RUBBER WEDGED HELP / TIMBERED.  RULE DOMICILES CUSHION    WITH WEDGE    RUBBER / WOOD.  STEL    ALIGNMENT / POSITION    CUSHION TO BRICK UP / WALL. HOLE WALL / WALL   VIA HOLE   CUSHION BY DRILLS,   FOR SCREW PLACE.  INSERT FISCHER   INTO BORE-HOLE.   FISCHER IS ACCELERATED WITH SCREWDRIVER.   DOOR LEAF TIDE / WINDOW   (  AFTER BEEN ASSEMBLED GLASS) INTO CUSHION.  STEL IS OUTFIT AND ASESSORISNYA ( WHEELS

INSTALLATION OF PHASE BIOFIL

Image
BioFil gang land the same size. Depth is adjusted with the pipeline toilets. Give solid foundation of sand approximately 10 cm.  BioFil in place to cut and set the correct position with the (water level).  Connect the pipes Inlet and outlet channels.  Fill with water BioFil ¼ through all the manhole to each room / screen simultaneously / balanced. Start up with the land around the BioFil a ¼ of the total higher.  Fill with water BioFil ½ through all the manhole to each room / screen simultaneously / balanced. Continue with the hoarding of land around the BioFil a ½ of the total higher.  Charging water to pass through outlets and continue excavation of the manhole at the neck.  Place the ventilation pipes.  If the top surface will be burdened needed cast reinforced concrete.