PERFORMING METHOD TALK SHOP CERAMICAL FLOOR

A.   PLANNING
 
I.   SHOP DRAWING: 
  1. DETERMINING CERAMICAL CUT REST HAS > ½ CERAMICAL BODY. 
  2. DETERMINING CERAMICAL NAD WALL & THAT FLOOR MEETS & NAD UNIFORM DELFT. 
  3. DETERMINE SO DELFT CROSSROAD MEETS. 
  4. DETERMINING SANITAIR'S LAYOUT & FIXTURE :    SHALL AT CROSSROAD / CERAMICAL BODY MEAN. 
  5. DETERMINING CERAMICAL ASSEMBLY STARTING POINT. 
  6. DETERMINING MINIMAL EXPANTION JOINT EACH   12 M² 16 M². 
II.  RESOURCES'S COUNT( RESOURCE) : 

a.   MATERIAL THAT IS UTILIZED: 
  •  DELFT. 
  • PC CEMENT.  
  •  WATER. 
  • ADDITIVE.    
b.   TOOL THAT IS UTILIZED: 
  •  ALUMINIUM MARGIN. 
  •  WATER TUB(  PAIL). 
  •  DUDUKAN / TATAKAN'S PLACE DELFT. 
  •  YARN OR STRING. 
  •  RUBBER MALLET. 
  •  SPESI'S SPOON. 
  •  WATERPASS.  
  •  SPADE. 
  •  SPUME / SPONGE 
  •  CLOTH / WET MOP.      
c.   LABOUR:  DETERMINING NEEDED LABOUR ON SCHEDULE AND WORK VOLUME.

B.   PERFORMING: 
  1. MAKE READY EQUIPMENT    AND MATERIALS    ONE THAT WILL BE UTILIZED. 
  2. UNDERSTAND JOB IMAGE,  ASSEMBLY PATTERN   AND OTHERS. 
  3. SORT OUT THAT DELFT RESULTS UNIFORMITY :  
  •         MEASURE / DIMENSION. 
  •        PRESISI.  
  •         COLOR. 

CERAMICAL SOAKING THAT WILL BE ASSEMBLED INTO WATER TUB( PAIL)   UP TO 1 HOUR. 


EXAMPLE:  WATER TUB

Comments

Popular posts from this blog

Pepadone Wong Serang, Kamus Base Jawe Serang

Kisah Gantarawang dan Abah Manta Sang Kuncen Terakhir

Asal Usul Jalan Kiyai Haji Sulaiman di Kota Serang Banten