PERFORMING METHOD TALK SHOP CERAMICAL FLOOR

A.   PLANNING
 
I.   SHOP DRAWING: 
  1. DETERMINING CERAMICAL CUT REST HAS > ½ CERAMICAL BODY. 
  2. DETERMINING CERAMICAL NAD WALL & THAT FLOOR MEETS & NAD UNIFORM DELFT. 
  3. DETERMINE SO DELFT CROSSROAD MEETS. 
  4. DETERMINING SANITAIR'S LAYOUT & FIXTURE :    SHALL AT CROSSROAD / CERAMICAL BODY MEAN. 
  5. DETERMINING CERAMICAL ASSEMBLY STARTING POINT. 
  6. DETERMINING MINIMAL EXPANTION JOINT EACH   12 M² 16 M². 
II.  RESOURCES'S COUNT( RESOURCE) : 

a.   MATERIAL THAT IS UTILIZED: 
  •  DELFT. 
  • PC CEMENT.  
  •  WATER. 
  • ADDITIVE.    
b.   TOOL THAT IS UTILIZED: 
  •  ALUMINIUM MARGIN. 
  •  WATER TUB(  PAIL). 
  •  DUDUKAN / TATAKAN'S PLACE DELFT. 
  •  YARN OR STRING. 
  •  RUBBER MALLET. 
  •  SPESI'S SPOON. 
  •  WATERPASS.  
  •  SPADE. 
  •  SPUME / SPONGE 
  •  CLOTH / WET MOP.      
c.   LABOUR:  DETERMINING NEEDED LABOUR ON SCHEDULE AND WORK VOLUME.

B.   PERFORMING: 
  1. MAKE READY EQUIPMENT    AND MATERIALS    ONE THAT WILL BE UTILIZED. 
  2. UNDERSTAND JOB IMAGE,  ASSEMBLY PATTERN   AND OTHERS. 
  3. SORT OUT THAT DELFT RESULTS UNIFORMITY :  
  •         MEASURE / DIMENSION. 
  •        PRESISI.  
  •         COLOR. 

CERAMICAL SOAKING THAT WILL BE ASSEMBLED INTO WATER TUB( PAIL)   UP TO 1 HOUR. 


EXAMPLE:  WATER TUB

Comments

Popular posts from this blog

Pepadone Wong Serang, Kamus Base Jawe Serang

Legenda Desa Gunung Malang

Tanah-Tanah Strategis di Kota Serang