PERFORMING METHOD TALK SHOP CERAMICAL FLOOR part 2


DELFT AERATED BY PLACED ON CERAMICAL PLACE,   AFTER PROCESSES SOAKING. 



CERAMICAL PLACE 

COUPLE BASELINE DETERMINATIVE AND PEIL OF FLOOR. 
THIS PEIL'S DETERMINATION FOR ALL UNITY.  
YARN TIDE AIMS HORIZONTAL AND VERTICAL ON ELEVATIONS APPROPRIATE FLOOR ON SHOP DRAWING. 




DOMICILE YARN SHALL LEVEL OFF AND ELBOW, IF AUGHT WALL IS WALL DELFT,  THEREFORE POSITION NAD FLOOR SHALL ADJUSTED BY AUGHT ON WALL. 

CERAMICAL TIDE AS COUPLE OF BASIS, ALONG BASELINE ALREADY BEING ASSEMBLED. 




CROSS A CHEQUE CERAMICAL ELBOW WITH ANGLE BAR AND CERAMICAL ELEVATION FLATNESS WITH WATERPASS. 



SECTIONED CONTENT / FLOOR SURFACE REGION THAT ANOTHER BY TELLS ON / SPESI. 
TIDE AFTERWARDS NEXT DELFT ACCORDS ITS POSITION UNTIL FINISHED,  LABOUR SO NO THREAD. 
IF DELFT WAS ASSEMBLED ALL,  KNOCK CERAMICAL SURFACE WITH RUBBER MALLET FOR FLATTEN DELFT SURFACE SO DOES NOT WRECK / BLEMISH. 
CHEQUE AFTERWARDS CERAMICAL ELEVATION FLATNESS WITH WATERPASS. 
CLEAR CERAMICAL COUPLE SURFACE ALREADY BEEN ASSEMBLED BY CLOTH / WET MOP UNTIL CLEAN SLATE. 



TO AVOID ITS RISE FLOOR(  FLOOR BECOMES TO CURVE)  THEREFORE MAKES DILATATION.   






THEN MAKES READY STUFFING / NAD'S CAST MATERIAL ON WATER TUB ( PAIL)   AND SWIRLS UNTIL ROLLED OUT. 

AFTER TELLS ON ROLLED OUT,  NAD'S CRANNY CONTENT WITH MATERIAL CAST NAD BY USE OF SPOON SPESI(  SPADE). 

NAD'S INLAY IS DONE IF DELFT POSITION WAS STRONG OR SPESI WAS DRY. 
THEN NEATENS NAD THAT WITH BORE.   



IDLED AND WAITS UNTIL NAD THAT BONE DRY. 

AFTER IS DRY,   CLEAR CERAMICAL COUPLE SURFACE ALREADY BEEN ASSEMBLED NAD OF MATERIAL ODDMENT CASTS NAD BY USE OF CLOTH / WET MOP UNTIL CLEAN SLATE. 


Comments

Popular posts from this blog

Pepadone Wong Serang, Kamus Base Jawe Serang

Legenda Desa Gunung Malang

Tanah-Tanah Strategis di Kota Serang