Posts

Showing posts from October, 2008

SHAFT DOOR INSTALLATION

Installation without welding system can be done by fix the anchor bar (12-14 mm) on the door frame then make a hole as anchor position. Afterwards, it filled with cements mixture & leave for +/- 1 day. You may set the door leaf after it have already dried off.

INSTALLATION METHOD FOR STEEL DOOR

Image
The most important things of Steel Door installation is door frame installation. The maximum tolerances for horizontal and vertical lot is +/- 1.5 mm. If exceed from that allowed tolerance, it can't open/close properly cause it will be rub against the floor or the door frame. The methods of installation that we use are welding system. The tools is welding transformer were need electrical power until 2000-4000 watt. Some welding techniques is used and adapted with opening wall conditions : Wall with practical column (ring balk on top side) : Welding Techniques : Weld the anchor bar (10-12 mm) on frame side and practical column. Corewall/Structure : Welding Techniques : set the dyna bolt (min. size 12x75 mm) on the corewall, and then weld the anchor bar (10-12 mm) on frame side and attached dyna bolt. Gypsum Wall : Welding Techniques : Use C-Channel (min. size 75x35x15x2.3) as hollow frame. Whereas the anchor bar (10-12 mm) was welded on frame to C-Channel.

Working Safety in Construction Project Part 4

Construction and Training  K3's construction and Training for all employ of level is contemned until supreme level.  Done upon project is begun and done by periodic ala.  Construction and Training subject:  K3's policy project  Trick does to talk shop safely  Saving trick and tacling emergency  Safety Committee  Need formed K3's Committee with membered all discipline relates and representative of contractor sub  Committee works through periodic ala (Safety Meeting) about problem K3 in project  Giving entry to manajamen in the effort K3's aspect step-up in project  K3's Promotion Up to project activity happens to be evened out by K3's Promotion program  Intent to remind and increases awareness employs project.  Promotion activity as poster, banner, bulletin, lomba K3 etc..  As much employ involvement  Safe Working Practices  Shall arrange safety guidance for each perilous work at environmentally project e.g.:  Burn work  Scaffolding  Work at high  Chemical Materi...

Working Safety in Construction Project Part 3

Identification   Each project have different characteristic, e.g. high-rise building project, weir development, plant wide etc..  Do identify danger potency in construction activity that will be performed.  For mapping danger potency terminological area or activity area each. Evaluation   Arrange evaluation about danger potency to determine priority scale bases Hazards Rating.  Risk Rating's grade of all construction activity that will be done. Develops The Plan  Base Identification result and strategical grade Evaluation operation and accident prevention.  Apply default working safety management concept.  Grade Programs K3LL'S Implementation and program that will be done (for deep shaped activity element)  Element example Programs Implementation  K3's policy  Administrative and Procedural  Lurching identification  Project Safety Review  Construction and Training  Safety Meeting and Safety Committee  Safety Promotion  Safe Working Practices  Work Permit system  Safety Inspe...

Working Safety in Construction Project Part 2

Human factor  Really dominant at construction environment.  Heterogeneous employ, skill's zoom and different education, Science about low safety.  Need special handle  Technical factor  Get bearing with Project job activity as purpose of equipment and weight tool, digging up, development, transportation etcetera.  Caused by technical condition and job method that doesn't accomplish safety default (substandards condition)  Human Factor prevention  Labouring elect  Training before job beginning  Construction and supervisi up to activity happens  Technical Factor prevention  Good work planning.  Preserve and equipment care  Observation and working equipment examination  Method purpose and safe construction tech  Management System implement Quality  K3's Implemented strategy at Construction Project                           Identification                          Evaluation                          Develop the Plan                          Implementation                        ...

Working Safety in Construction Project Part 1

Image
Background   Construction activity constitute essential element in development  Construction activity evokes various undesirable impact for example that concern working safety aspect and environmentally.  Construction activity shall be brought off by notices K3L'S default and rule that prevailing  Construction activity characteristic  Having circumscribed working life  Involve total big labour  Involve a lot of crude labour (labour) one that gets relative education contemn  Having tall job intensity  Get multi's character is disciplined and multi crafts  Utilizing medley working equipment, type, technology, capacity and its condition  Requiring tall mobilization (equipment, significant and labour)  Construction activity impact  Accident  Burnup  Job Effect disease  Sacrilege  Environmental trouble (Social, Security, Aesthetic,etc.)  Constructions Lurching type  Physical Hazards  Chemical Hazards  Electrical Hazards  Mechanical Hazards  Physiological Hazards  Biological Hazards ...

CONSTRUCTION PERFORMING STEP AT CABLE STAYED'S BRIDGE

Image

CONSTRUCTION PERFORMING STEP AT VIADUCT

Image

PERFORMING METHOD IMAGE CONSTRUCTION

Image

PRECON: Precast Concrete

Image
Precon's overall solution can be categorized into 3 main products : Structural Products Drainage Products Side Products : 1. Structural Products Precon HollowCore Wall and Floor Panels are latest technology solution suitable for wall, floor and flat roof construction. It replaces conventional construction method of using brick, concrete block, aluminium and steel. Precon HollowCore are manufactured and cut to fit the job complete with blockouts which facilitate simple fast erection and shorter time schedules. This main advantage of flexibility to design and accelerate time to construction. Precon Hollow Core fit for commercial and industrial buildings/factory because of its strength, durability, fire resistance, acoustic and insulation properties. " HollowCore Floor " Pre-stressed, thickness of 150,200,250,300, 350 mm " Maximum Length up to 12 meter " HollowCore Walls " Pre-stressed, "Exposed " or "Smooth Finishing", thickness of 150,200...

PDA TEST 6

PDA TEST 5

PDA TEST 4

Worm Pump for Spraying and Conveying

General Characteristics V50 is the Small worm pump with Big abilities. It can be a sprayer and a conveying pump for almost all materials up to 3mm. It is electronically variable with clockwise or anti-clockwise rotation and is equipped with remote control switcher making any application the easiest possible. Applications Extremely versatile V50 is suitable for: - Plasters - Finishing coats - Silicate plasters - Mineral plasters - Decoration paints and paint compounds - Sealing compounds - Liquid wallpaper - Thermal, soundproof and fireproof insulations - Concrete primers - Refurbishing mortars - Waterproof mortars - Filling joints, small holes, cracks and spaces - - - Between tiles and stones - Plasterboard coverings - Restoration injections - Controlled pressure injections Features - Gear motor - Galvanized container - Container vibrator - Control box - Warm pump - Chassis with wheels Advantages - Small and light. - Can be used for a big range of applications - Electronic speed variat...

PDA TEST 3

Worm Pump For Ready Mixed Materials

General Characteristics PS40 is an advanced continuously working mixing machine for all ready-mixed dry mortars and plasters. It can be filled with bagged material or connected with silo. Applications Thanks to its ergonomic design the fully equipped PS40 is ideal for a vast range of applications of plaster (gypsum/ gypsum-lime plaster), floor-screed, rendering (lime/ lime-cement and insulating plasters), bonding mortar as well as reinforcement mortars. Features - High performance 5,5kw geared motor for the mixer and pump. - 0,75kw geared motor for the dosing hopper - Diaphragm air compressor with pressure switch off - Warm pump - Dosing hopper with loading wheel - Mixing tube - Control box - Electro  mechanic or electronic remote switch  - Rubber hoses 25mm,10m with couplings. - Air hose 13mm, 10m with geka couplings. - Water pump - Water flow meter - Fine plaster gun with 14mm nozzle - Mixing tube - Cleaning shaft ACCESSORIES There is complete range of accessories including: - D...

PDA TEST 2

HANPIAO MATEL

Image

Universal Worm Pump for Spraying and Conveying Mortar

General Characteristics : PS180 is the Universal Worm gear pump for pumping, spraying, injecting, traditional, ready-mixed, masonry, insulating, cementicious, fibre, refurbishing, dispersion, adhesive, reinforcing, special and almost all types of mortars and plasters and floor screeds up to 6mm grain for up to 50m height and up to 80l/min output depending on the material and the worm type.  Thanks to the powerful 13HP Mitsubishi petrol engine, it is ideal for the user who does not have a 400 V connection available. PS180 is also available with a single phase 220V and a three phase 400V geared motor with frequency converter for easy and precise output adjustment according to the application and the type of material.  The pump can be filled from buckets, silos, horizontal mixers, M280 mixer and almost any kind of concrete mixers.  Complete series of accessories and spraying guns for different applications and materials are available. Applications : Pumping, spraying and injecting th...

PDA Test 1

FORMWORK FOR COLUMN PART 3

Pneumatic Conveyor For Floor Screeds

General Characteristics AERO450 is one of the lightest and most compact in its category, mixing and conveying unit with a 4-cylinder Diesel engine and a built-in air compressor. It offers mixing quality and easy conveyance for floor screeds, aggregates (sand, gravel etc), mortars, pearlite and concrete with grain up to 16mm. The 38kw 4-cylinder diesel engine in combination with 5 m3 output, screw type air compressor gives to AERO 450 a remarkable performance. The maximum output is 4,6m3/h and with the optional hydraulic loading bucket can be increased up to 35% per hour. AERO 450 is equipped with brakes and hand brake and thanks to the light and small dimensions construction is easy to transportation in the road and the job site.  The automatic lubrication system and the production according to European standards of quality and safety provide reliability, safety and low service cost. Applications MIXING AND CONVEYING OF: - FLOOR SCREEDS - INSULATION MATERIALS - PEARLITE - GRAVEL - SAND...

Multipurpose Double Piston Pump

General Characteristics PS3000 multipurpose double piston pump for high performance with maximum reliability. PS3000 thanks to its modern design and robust construction is perfect for conveying, spraying, backfilling and injecting almost all types of mortar, plaster, cement mixes slurries and floor screeds in the most difficult applications and conditions.  Wet spraying of lime and cement mortars, almost all types of plaster and ready mixed plasters in sacks for interiors and exteriors. Application : - Spraying cement mixes and mortar to coat cracks and refurbish old buildings, bridges, tunnels etc.  - Spraying cement mixes on mesh panels. - Conveying cement mixes, slurries and mortar for flooring beds. - Conveying masonry mortar for building walls. - Injection of cement grout. - Injection and conveying of cement grout and mortar in underground and difficult to reach surfaces, points and holes and damaged structures for filling and reinforcing. - Can also be used under silos. Feat...

FORMWORK FOR COLOUM

Building Management Profession Interest Project Part 2

Of plus watch gleam writer experience on implemented good project management principle and right at to amount to society activity, its face is understanding on project management haven't become a part one gets attention be equal to.  Although now utmost no two management profession organizations projects (PMI Chapter Indonesia and IAMPI), society consciousness (well ala individual and also institusional) on the importance for project management terminological writer stills low. One of case which may pull to talk over, e.g. management aspect runs the risk on proprietary IT system KPU on umpteen legislative General Election last time.  Voice extrapolation activity that utilize IT system help finds time to become focus while there are many appearance constraint. Although a large part constraint is on human factor (entering data of field), it may not see rasher alae. Really not false if there is that look on emerging problem constitutes one of lack of that adjusment of technology is al...

Building Management Profession Interest Project

Project management. Hearing this terminology maybe You have a lot of interpretation. There is that links as part of civil knowledge discipline (civil engineering). Or, there is that on the contrary allergic with word "project", as well as konotasi negative "project" activities at governance. Eventually, project definition actually been made to differentiate it from operation.  According to Project Management Institute, project is activity / tentative effort that is done as to establish product or unique service. Thing that adequately specific of characteristic project is its character that temporary, not workaday activity and repetitive. Project at least gets to be seen and is brought off of 9 subdisiplin sciences / managements namely: scope management , time management, cost management, quality management, resource management, communication management, risk management, procurement's management, and integration management. All a part this knowledge discipline m...

ERECTION PRECAST WITH MOBILE CRANE

VELOCITY EXPRESS PVC BOARD

Image
Housings timbered requirement and furniture progressively increase along with population developing.  Wood also being used by government as producer of foreign exchange.  Added with many its illegal loging, therefore at Indonesia being become by forest damage that really acute and troubles environment continuity. To back forest function as one of warrantee environment component its continuity,  therefore stage which needs to be done is discontinue forest wood hewing and does reforestation until forest back to strength and striking the balance. In this case, obviously beforehand needs to be looked for by material any other to replace wood as building materials and also furniture. PVC has a lot of top to be made substitution significant as building materials For Partisi's wall Ceiling. Top:  Waterproof  Anti Termite  Without Finishing  At liberty care  Fast assembly  Hot absorber  Knockdown  Muffling Fire  Demulcent and Penny Wise Frame  Are not alligatored or surge  Luxurious motif ...

BLUSTERY TECHNOLOGY AND SOLAR: SOCIETIES FUTURE SOLUTION COAST

Image
Wind and the sun is God confer that don't circumscribed it inexhaustible one since this earth are created hitherto. With technological developing that really quick current human beginning create wind power and the sun power station. Besides other power stations already long time utilized by men amongst those (PLTA, PLTU, PLTG, PLTN and any other) already most socialization on forward states and effloresce.  Wind power power station and well-matched the sun for territorial beach coast that have arbitrary weather. Since condition of Republic Of Indonesia archipelago State that consisting of isles and dwelt by coast societies, one that have economy zoom and culture social really concerns, one of the root cause minim it economy and society culture social coast is for lack of electricity.   Wind power and the sun power station constitute hibrida's technology that most new count and environmentally-friendly, first introduced by Guiseppe a doctor of Italian electricity firm year 1995....

MEMBRANE'S TECHNOLOGICAL PURPOSE TO FRESH WATER PRODUCTION AND WASTE WATER PROCESSING

Image
Membrane is one filter which made from plastical stuff (polycarbonat)  Pore structure in its weeny filter and filmy (micron)   Indonesia has one membrane's expert brazes to universalize that named Dr I Gede Wenten Dr I Gede Wenten makes alone Filter Membrane at Bandung (national product)   Filter Membrane can be utilized for application sort with dirt-cheap cost Helping region drying to converts waste water & rainwater become drinking water  APPLICATION AT NUSA TENGGARA TIMUR Waste water conversion hotel so not necessarily pay expensive water cost  JAYAKARTA'S HOTEL APPLICATION Recycling industrial waste without chemical substance so not necessarily incremental cost  ELECTROPLATING'S WASTE APPLICATION AT PT DHARMA POLIMETAL  Changing well water becomes Demin's water to Industry without use chemical material with bottommost operational cost  PT MEDCO ENERGY'S APPLICATION, KALTIM Changing water an river as drinking water without chemical substance with production ...

Bamboo Technology Laminates

Image
Bamboo is with shaped in origin that hollow, not prismatis, and its cutting that don't as whorled as perfect enough difficult to be merged. But such, adhesion tech enable merging among severally element with elongated foursquare cutting as one unity.  In this case beforehand bamboo is cut as prismatis bar shaped with elongated foursquare cutting.  Element afterwards this were re cover by paste and is forged as board or log. Remembering that element affiliate are molded of many overlays, board and resulting log so-called with board / overlay or board log / lamination log. Board laminates that have fiber is so beautiful it so both as raw material for wall makings, floor cover, door and furniture leaf.  Be log can be used as component of building construction, cushion etc. Bamboo purpose laminates in various requirement as industrial as furniture become one of solution on about problem getting rareness it wood supply for furniture worker at country that its requisition everlastingly i...

Bamboo Preservation Tech

Image
Make the point developed preservation utilizes tube, can be run without electric power, so match for rural. Preservative as solution of chemical is inserted with atmospheric pressure (Morisco, 1998). Solutions incoming process on bamboo gets diameter 8 cm, long 6 m need vicinity time 20 minutes. 

ALUMINIUM

Aluminium is an recyclable material which is not reduce in quality through many times of recylcle process, its about time this material being used as substitute to wood material. The world need rain forest as oksigen producer for the whole creatuires on earth. Light, strong, weather proof, and recyclable, these unique charateristics of aluminium has made it the best solution of all and also aluminium can be produce by anodize colour, powder coating colour and wood coating colour. High acquirement in air and sound penetration, water leakage and easy to install are ofter reasons why we pick aluminium for your building contraction, from simple house to sky scraper building. PRODUCT Profile Bar Aluminium profile bar based on requirement. An economic solution for you, who wants "do it yourself" fabrication in practical use. This superior quality of aluminium profile are support with anodize plus finishing technology. Or powder coating as alternative. Residential Doors & Window...